Monitoring measurement Rio Taquesi power plant

Bolivia

Deformation monitoring power plant.

Project

Due to damage to the power plant, Straub Vermessungen AG implemented a surveying network to monitor all the above-ground - and partly also the underground - structures for deformations.

The penstock is under special supervision at a gradient from 1970 to 2500 m above sea level. With the help of local employees, a follow-up measurement is carried out annually.

Timeline

Annually.

Client

Hidroeléctrica Boliviana S.A.

Services

  • Manual deformation measurements
  • Logging of results, reporting

Date: 08.06.2020