Alto Maipo Hydroelectric Project

Chile

Two run-of-theriver hydroelectric plants in underground.

Project

Alto Maipo project is located 50km South-East of the Chilean capital Santiago, in the highaltitude Maipo River basin and close to the Argentinean border where the high Andean peaks of up to 6,500m. The project consists of design, construction, operation and maintenance of two run-of-theriver hydroelectric plants, Las Lajas and Alfalfal II plants both in underground, with a total capacity of 532MW. 

Total cost

About $ 800.000.000

Période

2013-2021

Maître d’ouvrage

AES GENER/Strabag AG Tunnelbau
Constructora Nuevo Maipo S.A. (Hotchief – CMC JV)

Services provided

  • Detailed Design

  • Construction Follow-up

 

Date: 02.10.2023