Lisbon Metro's Red Line

Preliminary design & extension of the metro

PINI Group is pleased to join the project to extend the Lisbon Metro's Red Line

PINI Group has been awarded for the preliminary design of the underground works of the extension of the red line of the metro Lisbon. The project will allow to connect the existing station of S. Sebastiao II to Alcântara and it includes 4 km of tunnels and 4 stations.

The design will be carried-out in partnership with JLCM structural engineers. A new prestigious success strengthening the international footprint of the Group.

Date: 14.10.2021